Spring 2014 Lake Guest House Renovation
The downstairs was gutted and re-built. Pillars held up the first floor...and were in the middle of the room, so new support design was incorporated. The ceiling was raised, air ducts re-routed...can lighting added. The bar was re-built and an island created. Surround sound was built in, a window added as well as a new sliding door to the patio and a former store room was converted to the fifth bedroom.
Autres photos dans Spring 2014 Lake Guest House Renovation